[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: GSBN:Clay plastered wall passes 1-hour test!



Sorry, there was a mistake in the info I shared on French testing.
this is the right info:

Plaster on bales layed flat:
1000kg/mÓ (0,01 MPa) for a lime/hemp (+ a small aount of sand)
plaster (=25 times the weight of the plaster)

8000kg/mÓ (0,08 MPa) for a lime/SAND (no hemp)plaster (=200 times the weight of
the plaster)